Introducing West Raynham BESS

Bluefield Renewable Developments Ltd will be developing a Battery Energy Storage System (BESS) on land south of Shereford Road, West Raynham Estate, Fakenham, Norfolk, NR21 7LJ.

The planning application for the project (PF/25/1079) was approved by North Norfolk District Council on 4th November 2025.

The project will be located close to West Raynham Solar Farm. The 49.9MW Solar Farm, which is also owned by and managed by the Bluefield Group, received planning permission in 2015 and is currently operational.

As a result of ecological improvements made by Bluefield, such as wildflower meadow planting, West Raynham recently became the first solar farm in the UK to receive the Wild Power gold certification for biodiversity enhancements.

The BESS project will have a capacity of approximately 50MW. It will be used to balance the energy generated by solar farms with demand. It will also help stabilise the grid to reduce the threat of power cuts.

This network flexibility is increasingly required as the UK shifts its electricity generation from gas and coal-fired power stations to renewable sources. West Raynham BESS therefore contributes to the UK’s effort to reduce its greenhouse gas and other environmental emissions and strengthen energy security.

West Raynham Master BESS Layout - please click on image to zoom in

The benefits

  • Battery Energy Storage Systems (BESS) are a key component of integrated, low carbon energy systems, helping to maximise the use of renewable energy and contributing to the target of cutting carbon emissions by 78% by 2035.

  • By co-locating this project close to the already consented West Raynham solar farm it provides a number of benefits, including allowing the electricity network to “balance” generation against demand and supporting the UK’s urgent need for energy security. 

  • Careful consideration has been given to enable the development to integrate with the existing solar farm and grid infrastructure and to avoid material effects on landscape, heritage or ecological designations. 

  • It will have a positive net biodiversity impact with the retention of existing hedgerows and trees and new planting which will strengthen existing ecological networks.

  • This is classed as a ‘temporary development’. Decommissioning and full restoration of the site at the end of life of the development will be secured via planning condition.  There will be no change to land classification.

  • The proposed scheme does not rely on any direct government subsidies.

  • The proposed project complies with all existing health, safety and environmental legislation, including stringent fire safety management guidelines.

The Bluefield Group is a UK-based business which develops, builds and operates solar farms and battery storage projects on behalf of the funds it advises, including the stock market-listed Bluefield Solar Income Fund (BSIF).

Bluefield manages over 270 individual renewable energy assets with a capacity of over 1GW and an asset value of £1.8bn. Because we build and operate the projects we develop, we seek to establish long-term relationships with local communities and local authorities.

We aim to deliver high-quality projects that generate significant renewable energy, have low visual impact and enhance biodiversity and land management.

For more information on Bluefield Development please visit our website.

Public Consultation

We held a public consultation event on Thursday 3rd April at Hempton Memorial Hall, The Green, Fakenham NR21 7LG. Thank you to all those who attended.

You can access the boards that were shown at the event here.

Frequently Asked Questions

Contact Us

Please provide your contact details, if you’d like to hear back from us.

Names and contact details will not be included in the planning application or any other published material.

feedback@alpacacommunications.com

Freepost: ALPACA COMMUNICATIONS